Run Mode
Run Mode controls whether tests in a group execute at the same time or one after another. By default, groups run concurrently.
Concurrent (default)
All tests start simultaneously. Each test runs independently with no ordering guarantee. Best for groups where tests do not share state or depend on each other.
Sequential
Tests run one at a time, in the order shown in the group. The next test starts only after the previous one finishes. Best when tests share state, depend on each other, or target a shared environment that cannot handle parallel sessions.
Set up Run Mode
- Open Project → Tests tab.
- Click the Configure Trigger button on the group you want to configure.
- In the Run Mode section at the top of the panel, pick Concurrent or Sequential.
- Click Save.
Groups in Sequential mode get a small "Sequential" badge next to the group name in the Tests tab. Concurrent is the default and shows no badge.
